Good flooring starts below the surface. We prep the subfloor properly before installing tile, laminate or hardwood, so the finished floor stays flat and lasts.
In a plex, structure and services are shared, so we locate joists, pipes and wiring before we build, and plan noise and dust control for neighbours above and below.
In a condo or apartment building, construction follows strict co-ownership rules on hours, noise and floor protection, and we plan the schedule around them.
Parking is mostly on the street here, so we time visits and load-in to avoid permit and loading-zone problems.
Our team is based in Montréal, so jobs across the city's boroughs are usually scheduled quickly.
Parc-Extension is a dense, multicultural neighbourhood around avenue Ogilvy and rue Jean-Talon, full of rental plexes. Most homes are rentals, so we coordinate with landlords and tenants and keep access simple.
Flooring succeeds or fails on subfloor prep — leveling, moisture checks and acclimation prevent gaps, cupping and squeaks later.
Moisture-tolerant options like luxury vinyl plank or engineered products work best below grade.
Yes — we remove, dispose of and prepare the subfloor before installing the new floor.
Yes. FixWorks serves Parc-Extension and nearby areas including Villeray, Mile End, Outremont, Côte-des-Neiges. Call (438) 533-5664 or book online — we respond fast and often the same day. Parking is mostly on the street here, so we time visits and load-in to avoid permit and loading-zone problems.
Choose a time that works for you. Real availability, real confirmation.
Book Your Appointment