Good flooring starts below the surface. We prep the subfloor properly before installing tile, laminate or hardwood, so the finished floor stays flat and lasts.
Mile Ex, the former industrial district between Mile End and Parc-Extension, is now full of lofts, studios and renovated plexes. Converted warehouses and old plexes sit side by side, so one street can need very different solutions.
Flooring succeeds or fails on subfloor prep — leveling, moisture checks and acclimation prevent gaps, cupping and squeaks later.
In a condo or apartment building, construction follows strict co-ownership rules on hours, noise and floor protection, and we plan the schedule around them.
In a plex, structure and services are shared, so we locate joists, pipes and wiring before we build, and plan noise and dust control for neighbours above and below.
Many streets here have back lanes or narrow frontage, so we plan where to stage tools and materials before the visit.
This area is on the Island of Montréal, so travel is short and same-day response is often possible.
Moisture-tolerant options like luxury vinyl plank or engineered products work best below grade.
Yes — we remove, dispose of and prepare the subfloor before installing the new floor.
Yes. FixWorks serves Mile Ex and nearby areas including Mile End, Parc-Extension, La Petite-Patrie, Outremont. Call (438) 533-5664 or book online — we respond fast and often the same day. Many streets here have back lanes or narrow frontage, so we plan where to stage tools and materials before the visit.
Choose a time that works for you. Real availability, real confirmation.
Book Your Appointment