Good flooring starts below the surface. We prep the subfloor properly before installing tile, laminate or hardwood, so the finished floor stays flat and lasts.
Walk-up triplexes with iron spiral staircases line the streets around Avenue du Mont-Royal and rue Saint-Denis. Most buildings date from the early 1900s, so shared stairwells, original woodwork and tight back lanes shape how a job gets done.
Flooring succeeds or fails on subfloor prep — leveling, moisture checks and acclimation prevent gaps, cupping and squeaks later.
In a plex, structure and services are shared, so we locate joists, pipes and wiring before we build, and plan noise and dust control for neighbours above and below.
In a heritage home, walls are rarely square and materials are older, so we measure on site and build to what is really there rather than to a drawing.
Many streets here have back lanes or narrow frontage, so we plan where to stage tools and materials before the visit.
Our team is based in Montréal, so jobs across the city's boroughs are usually scheduled quickly.
Moisture-tolerant options like luxury vinyl plank or engineered products work best below grade.
Yes — we remove, dispose of and prepare the subfloor before installing the new floor.
Yes. FixWorks serves Plateau-Mont-Royal and nearby areas including Mile End, Rosemont, La Petite-Patrie, Outremont. Call (438) 533-5664 or book online — we respond fast and often the same day. Many streets here have back lanes or narrow frontage, so we plan where to stage tools and materials before the visit.
Choose a time that works for you. Real availability, real confirmation.
Book Your Appointment